Who pays for cleaning plugged sewer lines?Ĭity policy states that a customer should call the Wastewater Department before contacting a plumber. The City’s water supply contains about 8 to 9 grains of hardness, so a water softener is not necessary. Leak Information Do I need a water softener? Some leaks can go unnoticed until your meter is read. If your usage and or bill is an usual amount compared to your normal usage, it is likely you have a small leak. Questions frequently asked of the Water and Wastewater Departments. The water discharged from the Cheboygan Wastewater Treatment Facility is sent to the Cheboygan River approximately ½ mile from the mouth of the river, where it flows into Lake Huron. The facility is equipped with a full laboratory and staff for monitoring the discharge quality. The organisms are later removed from the treated water, and disinfection using chlorine follows, leaving the water clean enough to meet the stringent limitations of our National Pollution Discharge Elimination System (NPDES) permit. As they grow, these organisms remove the nutrients in the wastewater. These disks provide surface for the microorganisms to grow. RBC’s are large disks closely spaced along a rotating shaft that is partly submerged in the wastewater. The treatment facility was expanded in 1978 to provide secondary treatment using Rotating Biological Contractors (RBC’s). and has a contract to maintain their collection system and four main lift stations. The City of Cheboygan also treats sewage from a small portion of Inverness Twp. During heavy rain events, a 1.3 million gallon flow equalization basin stores excess flow until it can be treated when flows return to normal. The plant is rated for an average of 2.5 MGD, with a peak flow capacity of 5.0 MGD during wet weather conditions. The treatment facility currently treats an average of approximately two million gallons per day (2.0 MGD). The department is also responsible for installing new service taps. It provides service to approximately 2,073 residential and commercial accounts. The City of Cheboygan Wastewater Department maintains approximately 40 miles of collection system piping, six lift stations and the wastewater treatment facility. Project Plan for Wastewater Treatment Plant Upgrades (Draft).We also add a blended phosphate solution (80% polyphosphate and 20% orthophosphate) to control taste, color, and odor complaints that are a result of the dissolved minerals usually found in groundwater sources. The water is disinfected with chlorine to ensure that no harmful bacteria are present in the distribution system. The City’s water is supplied via groundwater. The Department also serves several customers outside of the city limits, per established intergovernmental agreements. There are approximately 2,021 residential and commercial billing accounts. The Department is also responsible for installing new service taps. The average daily production is approximately 910,000 gallons. The City of Cheboygan Water Department maintains approximately 49 miles of distribution piping, four production wells and one 500,000-gallon water storage tower.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |